Large crane being used for new Highway 37 bridge over James River north of Huron

Local News
KELO Highway 37 Crane

HURON, S.D. (KELO) — A large crane made its way near the James River on Highway 37 north of Huron Friday. 

Huron Area Engineer Brad Letcher took a photo of the tall crane driving down the closed highway. The bridge, located 12 miles north of Huron, closed on Monday.

The $5.3 million project will reconstruct the structure over the James River along with grading for one-half mile south. 
 

Copyright 2019 Nexstar Broadcasting, Inc. All rights reserved. This material may not be published, broadcast, rewritten, or redistributed.


 

Don't Miss!

More Don't Miss