User uShare Login | Register
Login
Register

Along with posting photos, videos, and stories, your uShare account lets you post Classified Ads, recipes on What's For Dinner, and Announcements.


73° View Weather Current Conditions Sioux Falls Change Location
Set Weather Options

RADAR LOCATION

TEMPERATURE LOCATION

Share your Photos, Videos, and Stories on uShare! Click here to get started.

News

[0] My Saved Articles
Back to all news

Business

Find local businesses
on the KELO Pages!

 

Oak Mountain Development Back On Well's Water

January 10, 2013, 5:26 AM

DEADWOOD, SD -

The Oak Mountain Development's water treatment plant near Deadwood is running again after a holiday shutdown that required $12,000 in repairs.

The development in Boulder Canyon purchases its water from a well owned by the city of Deadwood.

The well was not drawing enough water because calcified mineral material was blocking the flow into the well casing.

Public Works Director JR Raysor says a pump was removed, high pressure aeration was used to remove the mineral deposits and the pump was dropped back in.

The 37 homes in Oak Mountain were put back on the development's old well during the time the new well was fixed.

Previous Story

Next Story




Sponsored

 


View business

You may also like

Red Robin Hiring In Sioux Falls

6/24/2015 2:51 PM

There is evidence that Red Robin is coming to Sioux Falls.

Full Story
Slide The City Skips Fargo & Looks North Of Sioux Falls

6/23/2015 12:07 PM

Organizers are still hopeful they'll be able to bring the 300 foot slide to the Sioux Falls area.  They're currently looking at a spot se...

Full Story
Wild Bat Found At Great Plains Zoo Tests Positive For Rabies

6/26/2015 11:19 AM

The Great Plains Zoo is warning visitors after a bat found on a sidewalk there tested positive for rabies.

Full Story
Speed Limit Dropping To 75 MPH Along Stretch Of I-90

6/26/2015 1:53 PM

Starting next week, drivers on Interstate 90 will have to slow down from the Wyoming border to just west of Exit 55 in Rapid City.

Full Story
$8 Million Renovation Planned For DM&E Downtown Building

6/25/2015 10:37 AM

An old railroad office building at 140 N. Phillips that has sat vacant for the last few years in downtown Sioux Falls is getting a new lease...

Full Story


Events