User uShare Login | Register

Along with posting photos, videos, and stories, your uShare account lets you post Classified Ads, recipes on What's For Dinner, and Announcements.

34° View Weather Current Conditions Sioux Falls Change Location
Set Weather Options




[0] My Saved Articles
Find local businesses
on the KELO Pages!


Pierre Still Fixing Flood Damage

July 20, 2012, 7:09 PM by Erich Schaffhauser

Pierre Still Fixing Flood Damage

It's been a very dry year but flooding is still on the mind of city leaders in Pierre because they're still repairing some of the flood damage from last year.

Road construction near downtown Pierre is just one project in the works. It was supposed to be done last year but flood repair pushed it back. Fixing flood damage is also taking time out of this year’s work.

"We're getting a good start, some of the most obvious issues such as the sink holes have been filled, repaired and patched over," city operations manager Lynn Patton said.

But Patton says there's still pipe work to complete, not to mention the regular work scheduled last year that was interrupted by the flood.

While some projects are now moving forward, others have taken a back seat. And of course there's an ongoing effect as work is pushed back year after year. It could be several years before the city is caught up.

"Easily five years,” Patton said. “We've got some large storm sewer pipe replacement to be done or repair."

The city has authorized some projects but others are essentially waiting in line for a gap to open in a future city budget.

"These flood related projects are large; they're large diameter. They require bigger equipment that the city crews normally have available to them to work on. And the materials are extremely costly," Patton said.

Some projects have been approved for FEMA reimbursement but Patton says others are still in the process. Even with the Missouri River back in its banks, the city faces continuous reminders of the stretch of time last year when it wasn't.

Patton says crews haven't been delayed this year because there's been little rain. But they also haven't made up much time either.

Previous Story

Next Story




View news

You may also like

Roslyn Man Arrested In Shooting

11/21/2015 4:46 PM

A Roslyn, South Dakota man is accused of trying to kill another man overnight.

Full Story
Ronald Neels Sentenced To 75 Years In Prison

11/23/2015 5:59 PM

For more than a decade, nobody knew Ronald Neels was sexually abusing a victim inside his home near Garretson. The victim never said anything about th...

Full Story | Watch
Joseph Patterson Sentenced To Life In Prison

11/19/2015 3:55 PM

A judge has sentenced a man who was found guilty in the death of a two-year-old to life in prison without the possibility of parole.

Full Story
Jared Fogle Gets More Than 15 Years In Prison

11/19/2015 12:20 PM

A judge has sentenced former Subway pitchman Jared Fogle to 15 years and eight months in prison for trading in child pornography and having sex with u...

Full Story
uShare: Snow Photos

11/20/2015 1:51 PM

Where initial forecasts called for 2 to 4 inches, parts of southeast South Dakota are seeing 10 to 12 inches of snow on Friday.

Full Story