User uShare Login | Register
Login
Register

Along with posting photos, videos, and stories, your uShare account lets you post Classified Ads, recipes on What's For Dinner, and Announcements.


66° View Weather Current Conditions Sioux Falls Change Location
Set Weather Options

RADAR LOCATION

TEMPERATURE LOCATION

Share your Photos, Videos, and Stories on uShare! Click here to get started.

KELOLAND.com | Sioux Falls News & Weather, South Dakota News & Weather, Minnesota and Iowa News

[0] My Saved Articles
Find local businesses
on the KELO Pages!

 

Pierre Still Fixing Flood Damage

July 20, 2012, 7:09 PM by Erich Schaffhauser

Pierre Still Fixing Flood Damage
PIERRE, SD -

It's been a very dry year but flooding is still on the mind of city leaders in Pierre because they're still repairing some of the flood damage from last year.

Road construction near downtown Pierre is just one project in the works. It was supposed to be done last year but flood repair pushed it back. Fixing flood damage is also taking time out of this year’s work.

"We're getting a good start, some of the most obvious issues such as the sink holes have been filled, repaired and patched over," city operations manager Lynn Patton said.

But Patton says there's still pipe work to complete, not to mention the regular work scheduled last year that was interrupted by the flood.

While some projects are now moving forward, others have taken a back seat. And of course there's an ongoing effect as work is pushed back year after year. It could be several years before the city is caught up.

"Easily five years,” Patton said. “We've got some large storm sewer pipe replacement to be done or repair."

The city has authorized some projects but others are essentially waiting in line for a gap to open in a future city budget.

"These flood related projects are large; they're large diameter. They require bigger equipment that the city crews normally have available to them to work on. And the materials are extremely costly," Patton said.

Some projects have been approved for FEMA reimbursement but Patton says others are still in the process. Even with the Missouri River back in its banks, the city faces continuous reminders of the stretch of time last year when it wasn't.

Patton says crews haven't been delayed this year because there's been little rain. But they also haven't made up much time either.

Previous Story

Next Story


Comments







 
Find Local Businesses on KELO Pages!

You may also like

Jesus Take The Wheel

9/25/2014 10:00 PM

Miracle on the highway: that's how many people are describing a bad crash between a semi-truck and car in which no one was killed.

Full Story | Watch
Autistic Student Gets Royal Treatment

9/26/2014 4:55 PM

Friday night's homecoming at Brandon Valley High School is a crowning achievement for a senior who's living with autism.

Full Story | Watch
Iowa Teen Dies Two Days After Fight At School

9/28/2014 11:42 AM

Prosecutors may file additional charges because a western Iowa teen died two days after suffering a head injury during a fight at school.

Full Story
Verdict Reached In McCahren Case

9/23/2014 8:51 PM

Braiden McCahren walked out of the Tripp County Courthouse Tuesday night a convicted killer.

Full Story
Police: Missing Boy Shows Up At School

9/26/2014 6:39 AM

Sioux Falls police say a missing boy showed up for school Friday morning.  

Full Story


Events