User uShare Login | Register

Along with posting photos, videos, and stories, your uShare account lets you post Classified Ads, recipes on What's For Dinner, and Announcements.

25° View Weather Current Conditions Sioux Falls Change Location
Set Weather Options




[0] My Saved Articles
Find local businesses
on the KELO Pages!


SF Road Construction Projects Announced

May 27, 2014, 3:26 PM

SF Road Construction Projects Announced

Grange Avenue From 28th To 29th Street

Beginning on Thursday, May 29, construction crews will be performing street and utility work on Grange Avenue from 28th Street to 29th Street. Traffic will be shifted but will be maintained in both directions at all times. The use of flaggers may be required at times to maintain traffic.

This work is anticipated to be finished in approximately one week. Drivers are urged to use caution and reduce their speed while travelling near the construction area and may want to consider alternate routes.


Rescheduled Bike Trail Closure

The bike trail closure originally scheduled to begin on Tuesday, May 27, has been rescheduled.

Beginning on Monday, June 2, 2014. the bike trail near the Big Sioux Pumping Station north of the Sioux Falls Regional Airport will be closed. The existing trail will be excavated to install new electrical lines for the relocation of a generator. The detour route will be on the paved service road directly adjacent to the existing bike trail with detour signage in place.

The bike trail will be back open by Friday, June 6, 2014. 


Technology Drive From Valhalla Boulevard And 53rd Street

Beginning Wednesday, May 28, construction crews will be working on Technology Drive between Valhalla Boulevard and 53rd Street. Work will consist of sanitary sewer repairs and concrete curb and gutter repairs. Traffic will be detoured around the work area on Louise Avenue and 49th Street.

Work is expected to be completed within two weeks with favorable working conditions. Drivers are urged to use caution and reduce their speed while travelling near the construction area and may want to consider alternate routes.

Previous Story

Next Story



View news

You may also like

Roslyn Man Arrested In Shooting

11/21/2015 4:46 PM

A Roslyn, South Dakota man is accused of trying to kill another man overnight.

Full Story
Ronald Neels Sentenced To 75 Years In Prison

11/23/2015 5:59 PM

For more than a decade, nobody knew Ronald Neels was sexually abusing a victim inside his home near Garretson. The victim never said anything about th...

Full Story | Watch
Joseph Patterson Sentenced To Life In Prison

11/19/2015 3:55 PM

A judge has sentenced a man who was found guilty in the death of a two-year-old to life in prison without the possibility of parole.

Full Story
Tyrese Ruffin's Mother Speaks Publicly For First Time

11/25/2015 6:18 AM

In her first and only television interview, Doohen talked about her son, who she called the joy of her life.

Full Story
uShare: Snow Photos

11/20/2015 1:51 PM

Where initial forecasts called for 2 to 4 inches, parts of southeast South Dakota are seeing 10 to 12 inches of snow on Friday.

Full Story