User uShare Login | Register
Login
Register

Along with posting photos, videos, and stories, your uShare account lets you post Classified Ads, recipes on What's For Dinner, and Announcements.


30° View Weather Current Conditions Sioux Falls Change Location
Set Weather Options

RADAR LOCATION

TEMPERATURE LOCATION

Share your Photos, Videos, and Stories on uShare! Click here to get started.
Winter Returns To KELOLAND This Weekend. Click here for details. 

 

News

[0] My Saved Articles
Find local businesses
on the KELO Pages!

 

SF Road Construction Projects Announced

May 27, 2014, 3:26 PM

SF Road Construction Projects Announced

Grange Avenue From 28th To 29th Street

Beginning on Thursday, May 29, construction crews will be performing street and utility work on Grange Avenue from 28th Street to 29th Street. Traffic will be shifted but will be maintained in both directions at all times. The use of flaggers may be required at times to maintain traffic.

This work is anticipated to be finished in approximately one week. Drivers are urged to use caution and reduce their speed while travelling near the construction area and may want to consider alternate routes.

 

Rescheduled Bike Trail Closure

The bike trail closure originally scheduled to begin on Tuesday, May 27, has been rescheduled.

Beginning on Monday, June 2, 2014. the bike trail near the Big Sioux Pumping Station north of the Sioux Falls Regional Airport will be closed. The existing trail will be excavated to install new electrical lines for the relocation of a generator. The detour route will be on the paved service road directly adjacent to the existing bike trail with detour signage in place.

The bike trail will be back open by Friday, June 6, 2014. 

 

Technology Drive From Valhalla Boulevard And 53rd Street

Beginning Wednesday, May 28, construction crews will be working on Technology Drive between Valhalla Boulevard and 53rd Street. Work will consist of sanitary sewer repairs and concrete curb and gutter repairs. Traffic will be detoured around the work area on Louise Avenue and 49th Street.

Work is expected to be completed within two weeks with favorable working conditions. Drivers are urged to use caution and reduce their speed while travelling near the construction area and may want to consider alternate routes.

Previous Story

Next Story


Sponsored
Find Local Businesses on KELO Pages!

View news

You may also like

Police Searching For Two Suspects In Shooting

1/30/2015 12:09 AM

Sioux Falls Police are investigating a Thursday night shooting that occurred near the Empire Mall. 

Full Story
1 Dead After ATV Goes Through Ice On Perkins Co. Lake

1/25/2015 8:08 AM

A Newcastle, Wyoming man died after an ATV broke through the ice on a lake in northern Perkins County in South Dakota.

Full Story
Police Identify Two Suspects In Sioux Falls Shooting

1/30/2015 10:55 AM

Police are searching for 17-year-old Conner Hanson and 19-year-old Robert Montes. Hanson and Montes are reported to be dangerous and should not be app...

Full Story
Man Rescued From Big Stone Lake After Falling Through Ice

1/29/2015 5:30 PM

Officials are urging caution on the ice as warmer temperatures lead to changing ice conditions across the region.

Full Story | Watch
Augustana College Student Found Safe

1/28/2015 10:56 AM

On Tuesday, a 19-year-old student left her room saying she was headed to the bathroom. Her roommate reported her missing when she had not returned.

Full Story


Events