User uShare Login | Register
Login
Register

Along with posting photos, videos, and stories, your uShare account lets you post Classified Ads, recipes on What's For Dinner, and Announcements.


22° View Weather Current Conditions Sioux Falls Change Location
Set Weather Options

RADAR LOCATION

TEMPERATURE LOCATION

Accumulating snow possible Monday night - Tuesday. Storm Center Update.

 

News

[0] My Saved Articles
Find local businesses
on the KELO Pages!

 

Most Popular Today


SF Road Construction Projects Announced

May 27, 2014, 3:26 PM

SF Road Construction Projects Announced

Grange Avenue From 28th To 29th Street

Beginning on Thursday, May 29, construction crews will be performing street and utility work on Grange Avenue from 28th Street to 29th Street. Traffic will be shifted but will be maintained in both directions at all times. The use of flaggers may be required at times to maintain traffic.

This work is anticipated to be finished in approximately one week. Drivers are urged to use caution and reduce their speed while travelling near the construction area and may want to consider alternate routes.

 

Rescheduled Bike Trail Closure

The bike trail closure originally scheduled to begin on Tuesday, May 27, has been rescheduled.

Beginning on Monday, June 2, 2014. the bike trail near the Big Sioux Pumping Station north of the Sioux Falls Regional Airport will be closed. The existing trail will be excavated to install new electrical lines for the relocation of a generator. The detour route will be on the paved service road directly adjacent to the existing bike trail with detour signage in place.

The bike trail will be back open by Friday, June 6, 2014. 

 

Technology Drive From Valhalla Boulevard And 53rd Street

Beginning Wednesday, May 28, construction crews will be working on Technology Drive between Valhalla Boulevard and 53rd Street. Work will consist of sanitary sewer repairs and concrete curb and gutter repairs. Traffic will be detoured around the work area on Louise Avenue and 49th Street.

Work is expected to be completed within two weeks with favorable working conditions. Drivers are urged to use caution and reduce their speed while travelling near the construction area and may want to consider alternate routes.

Previous Story

Next Story


Sponsored
Find Local Businesses on KELO Pages!

View news

You may also like

Semis Crash When Both Don't Fit Under Overpass

2/23/2015 12:32 PM

A semi driver had to be taken to the hospital following a crash on Interstate 90.

Full Story
Two New Members Join The KELOLAND Family

2/23/2015 4:41 PM

The KELOLAND family grew by two over the weekend.

Full Story
Minnesota Man Catches Walleye Whopper

2/27/2015 10:21 AM

Paul Ell of Big Lake, MN snagged a 11.6-pound, 29.5-inch walleye after 6 p.m. Thursday night.

Full Story
3 Teens In Custody After Driving Stolen Vehicle

2/24/2015 11:04 AM

Early Tuesday morning, a Sioux Falls woman reported her 2001 Land Rover Discovery was stolen. A set of keys were left in the vehicle's center cons...

Full Story
Woman Admits To Having Sexual Contact With A Teenager

2/27/2015 10:44 AM

A former Sioux Falls teacher pleads guilty to sexual contact charges for a relationship she had with a student. 

Full Story


Events