User uShare Login | Register
Login
Register

Along with posting photos, videos, and stories, your uShare account lets you post Classified Ads, recipes on What's For Dinner, and Announcements.


53° View Weather Current Conditions Sioux Falls Change Location
Set Weather Options

RADAR LOCATION

TEMPERATURE LOCATION

News

[0] My Saved Articles
Find local businesses
on the KELO Pages!

 

Road Construction Round Up

May 25, 2014, 4:04 PM

Road Construction Round Up
SIOUX FALLS, SD -

Another round of street construction projects will begin after the Memorial Day Holiday in Sioux Falls. Here’s a look at the weekly road construction round up.

  • 41st Street

Starting Tuesday, the westbound outside lane of 41st Street will be closed east of Kiwanis. Traffic heading west will use the inside lane.

Fiber Optic cable will be installed and the work should be finished by noon.

  • 69th Street

Beginning at 8:30 a.m. on Tuesday, crews will close down both westbound lanes of 69th Street at Charger Circle.

Utility services will be installed and should be finished the end of Thursday.

  • Eighth Street

Also on Tuesday, Eighth Street will be closed from Fairfax to Sherman Avenue.

Crews will be working on utility replacement, concrete paving, replacing traffic signals and installing new street lights.

Those traveling on Eighth will be detoured to Weber Avenue, Sixth Street and Van Eps Avenue.

  • Garfield Avenue

Work starts on the intersection of 16th Street and Garfield, Tuesday. This will close the intersection. Crews will be working on the south valley gutter.

Garfield will be closed for about a week.

  • 26th Street

The inside westbound lane on 26th Street will be closed on Alpine Avenue, Tuesday. Crews will be performing concrete repairs as traffic will be merged to the outside lane.

The work should be finished in a week.

  • Bike Trail Closure

The bike trail near the Big Sioux Pumping Station, will be closed on Tuesday. Crews will be installing new electrical lines, excavating the existing trail. The trail will be detoured to the paved service road adjacent to current trail and detour signs will be in place.

Riders can expect the trail to reopen on Friday.

  • Bahnson Avenue

Starting Wednesday at 8:30 a.m., Bahnson Avenue’s northbound lane will be closed at 18th Street. Traffic will be shifted but maintained both ways.

The work should be finished by June 4.

Previous Story

Next Story




Sponsored
 

View news

You may also like

Four Arrested In Church Vandalism

5/18/2015 1:47 PM

Three Sioux Falls residents face charges after allegedly breaking into a west central Minnesota church.

Full Story
Woman Says Man Drugged Her at Concert, Hopes Story Helps Others

5/19/2015 6:05 PM

It was supposed to be an unforgettable concert, but a woman says she cannot remember it because she believes someone drugged her.

Full Story | Watch
One Killed, Five Hurt In Crash Near Bowdle

5/18/2015 2:07 PM

A Colton man is dead and five other people are hurt following a crash on U.S. Highway 12 near Bowdle on Sunday.

Full Story
Chicken Doesn’t Recognize Boy After Hair Cut

5/19/2015 12:22 PM

Video of a young boy getting a hug from a chicken is collecting a flock of fans.

Full Story
Police Officer Killed In Omaha Shooting

5/21/2015 5:42 AM

Police in Omaha, Nebraska, say a shootout between officers and a convicted felon has left an officer and the suspect dead.

Full Story


Events