Back to: News
June 22, 2014 08:03 AM

Road Work On Highway 50 To Begin Monday

Yankton, SD

Cold milling asphalt and asphalt concrete resurfacing along with bridge repair will begin this week on Highway 50 from the Charles mix/Bon Homme County line and will head east for 11 miles.

The cold milling work will begin on Monday with the resurfacing to begin the week of June 30.

Traffic will be reduced to one lane and guided through the project with flaggers and a pilot car. Those traveling can expect a delay of about 10 minutes during the day.

Three bridges will have barrier curb and bridge deck work done starting in mid-July reducing the traffic to one lane with stop signs or traffic signals on both ends of each bridge.

  • News
  • General

Keloland Live Doppler

Sioux Falls, SD - Change